Sattva Engineering Construction Limited IPO – GMP, Review, Share Price, Subscription, and Details

IPOGMPTracker

IPOGMPTracker Team

Aug 26, 2025 · 2 min read

Sattva Engineering Construction Limited IPO – GMP, Review, Share Price, Subscription, and Details
IPO GUIDE
IPOGMPTRACKER

Complete analysis of the Sattva Engineering Construction Limited initial public offering (IPO), including daily grey market premium (GMP) updates, subscription trends, and allotment links.

1.Sattva Engineering Construction Limited IPO Overview

The initial public offering (IPO) of Sattva Engineering Construction Limited is a public issue under the SME board. The subscription window is scheduled to open on Aug 26, 2025 and close on Aug 29, 2025, with the price band fixed at ₹70–75 per equity share.

2.Issue Details at a Glance

DetailValue
Bidding DatesAug 26, 2025 – Aug 29, 2025
Price Band₹70–75
Lot Size1600 shares
Minimum Investment₹1,12,000
Issue SizeTBA
Listing AtNSE SME

3.Bidding, Allotment & Listing Timeline

4.Sattva Engineering Construction Limited IPO GMP Today

The grey market premium for Sattva Engineering Construction Limited is currently ₹17 per share — roughly 23% over the upper price band. GMP is an informal, unregulated indicator of listing-day sentiment; it is not published by any exchange and can change before listing, so treat it as sentiment rather than a forecast.

5.How to Apply for Sattva Engineering Construction Limited IPO

  1. 1Open IPOGMPTracker or use your broker's app or net banking ASBA facility.
  2. 2Search for "Sattva Engineering Construction Limited IPO" and select it from the list of current issues.
  3. 3Choose your demat account and enter your bid quantity in multiples of the 1600-share lot, at a price within the ₹70–75 band (or bid at cut-off, if eligible).
  4. 4Submit the application and approve the UPI mandate request when it arrives — funds stay blocked in your account and are debited only on allotment.

Allotment is expected to be finalised around TBA, with listing tentatively scheduled for 2025-09-03 on BSE and NSE. Once finalised, check your status on the Sattva Engineering Construction Limited IPO allotment status page.

6.How to Track Subscription & Allotment

7.Conclusion

Sattva Engineering Construction Limited opens on Aug 26, 2025 and closes on Aug 29, 2025 at ₹70–75 per share. Read the offer documents in full and consult a qualified adviser before applying — nothing on this page is investment advice.

Track it on IPOGMPTracker

Continue reading in-depth IPO analysis, allotment guides, and investment tutorials

View All
Symbiotec Pharmalab

Symbiotec Pharmalab

LiveMainboard
GMP +330

Price Band: 938–₹988

Hy-Tech Engineers

Hy-Tech Engineers

LiveMainboard
GMP +23

Price Band: 50–₹53

Sumax Engineering

Sumax Engineering

LiveSME
GMP +21

Price Band: 95–₹101

Priority Jewels

Priority Jewels

UpcomingMainboard
GMP +12

Price Band: 190–₹200

Annu Projects

Annu Projects

LiveMainboard
GMP +0

Price Band: 94–₹99

Madhur Knit Crafts

Madhur Knit Crafts

LiveSME

Price Band: 95–₹100