
IPO Dates
Aug 26, 2025 – Aug 29, 2025
Lot Size
1600
Listing
Sep 3, 2025
Listing At
NSE SME
Overall Subscription
Total Bids Received
378.72x
Shares Offered
7,29,600
Shares Offered
9,69,600
Shares Offered
14,52,800
Shares Offered
17,05,600
Shares Offered
2,68,800
Founded in 2013, Current Infraprojects Limited (CIPL) is a renewable energy and infrastructure firm with civil, mechanical, electrical, and water engineering service provision.Specializing in Engineer...
EPS (Pre-IPO)
6.79
EPS (Post-IPO)
4.94
P/E (Pre-IPO)
11.78
P/E (Post-IPO)
16.19
RoNW
39.84%
PAT Margin
10.40%
P/B Value
4.55
* All figures are in ₹ Crores unless otherwise stated.
A-27, Basant Vihar Vaishali Marg (West), Panchyawala Jaipur, Rajasthan, 302034
Bigshare Services Pvt Ltd
The lot size for Current Infraprojects Limited IPO is 1600 shares per lot.
The Current Infraprojects Limited IPO opens on Aug 26, 2025 and closes on Aug 29, 2025.
Current Infraprojects Limited IPO is expected to be listed on Sep 3, 2025 on NSE SME.
The current GMP for Current Infraprojects Limited IPO is ₹35. Note: GMP is an unofficial market indicator.
The registrar for Current Infraprojects Limited IPO is Bigshare Services Pvt Ltd. You can contact them at ipo@bigshareonline.com.